Submitted by: ajules86 – Lexington, VA USA
I had a contractor working under me strip latex paint off a deck handrail down to bare wood and I applied two coats of green stain. The deck is about 10’x12′. It took him 23 hours to completely strip the paint and it took me 8 hours to apply two coats o
Four days work? At $50 per hour that would be $1,600. This level of work would require a license in most areas.
no
it doesnt require a license
olga shulman lednichenko
How much I should charge for re staining decking and hand rail quite a big area
How much should I charge to stripe, sand ,stain and seal a 13×26 deck.
Redwood deck & steps approx. 400 sq ft needs stripping, power washing & staining